Scale e parapetti CDV Gordola

Scale e parapetti CDV Gordola

Client

Consorzio Depurazione Acque del Verbano

Engineering firm

Studio TBF & Partner / Pawlowski Engineering firm

Scale e parapetti CDV Gordola

Scale e parapetti CDV Gordola

Project description

Laying of back staircase and boardwalk to access and link the coverings of the silos.

Laying of calendered, hot dip galvanized railings so as to protect from the falling from the silos .

Technical features

Steel hot-dip galvanized staircase equipped with 3 ramps and an upper transverse partially cantilevered boardwalk. Total height of 9 m, carpentry total weight of 6 tons.

Calendered railings, with 2 different diameters – 10 m and 15 m –  and equipped with hot dip galvanized tubulars pressed at the ends, for a total of 80 m of protection. Height of protection above the floor of 1'100 mm 

Technical description

Design and construction of the access staircase linking the two silos. Hot dip galvanized structure equipped with grid steps and landings. The complexity of the object relates essentially to the presence of very precise dimensional constraints both to the base and the roof, having the need to lay an upper partially cantilevered rigid boardwalk linking the two buildings and shaped so as not to conflict with the technical installations, despite the very limited available margin of space .