Safety measures by the railway line | Vezia | 2012

.

Misure di protezione lungo la linea ferroviaria | Vezia | 2012

Client

Consorzio Lotto 822 c/o Enio Ferrari SA

Engineering firm

Consorzio d’ingegneria ITC ITECSA-TOSCANO

Description

Safety measures implement for the rails during the enlargement works.

Tecnical features

155 m x 10 m high for a total of 1550 m² total extension of the protection.

Technical description

Construction and assembly of 40 columns linked by horizontal galvanized steel cables and a safety net.

The assembly operations took place while rail traffic was temporarily suspended.