Project description

Covering of the structure, renovation of the covering on the pre-existing building.

Technical features

The building is 42 m long and from 8 m to 13 m high. The façade is 33 m long. The material is composed of insulated panels, substructure made of galvanized metal sheets, pre-varnished steel corrugated metal sheets.

Ampliamento Frigerio | Locarno| 2016

Technical description

Starting from the pre-existing building, we laid the covering of the structure with an inside-outside stratigraphy composed of insulated panels fastened to the carpentry and/or to the concrete, substructure made of vertical Z metal sheets (thus allowing the necessary ventilation), edge metal sheets, window sills , dripstones and intradoses, façade corrugated metal sheets.

The roof was laid using the same principle although it is slightly more complicated, given the original “wave” design that accompanies the longitudinal section of the building towards the shelter obtained on the façade.

Ampliamento Frigerio | Locarno| 2016

Client

Poncini Holding SA

Engineer

Studio Anastasi & Partners, 6600 Locarno

Architect

3GArchitetti, 6598 Tenero

Supervision of construction

Studio Anastasi & Partners, 6600 Locarno