Go to page: Costruzioni in acciaio_2

Giubiasco waste-to-energy plant | 2008-2009

Main supporting structure

Impianto termovalorizzazione | Giubiasco | 2008-2009

Client

Consorzio 29 c/o Muttoni SA

Architectural firm

Vacchini SA, Locarno

Engineering firm

Studio Anastasi, Locarno

Impianto termovalorizzazione | Giubiasco | 2008-2009

Technical features 

Metal carpentry weight 1207 Tons, columns height 31.9m, maximum surface 3072 m².

Description

External building supporting structure and upper floor’s supporting structure.

Technical description

Supply and laying of the rectangular sectioned supporting columns (height up to 32 m), made of press formed metal sheet and assembled by longitudinal welding and having a double function: the structural and the containment of the sprayed casted-in-place concrete function. 

The covering was built by using a structure composed of solid web sections that link the columns to the perimeter, equipped with concrete gables.

The deck is made of fretted metal sheet on which the insulation and waterproofing are placed.

Termovalorizzatore | Giubiasco | 2008

La versione del vostro browser รจ troppo vecchia per una visione ottimale del sito.